Don-Jo has a minimum order requirement. Orders smaller than the required minimum have a longer lead time as we need to consolidate onto a "stock" order. If you need a faster lead time, simply exceed the minimum order amount.
Download File
Please let us know if there is anything else we can help with.
Click Here
It has to be offset that you require and it might just work for your constrained application where you have a rose up from a cylindrical lock because it is prepared to work around compatible with the rose up from the cylindrical lock.