Introduction
RH-PUSH UNITS: • Rotate the ELS Board Pulley Counter-Clockwise unit hard stop is reached. • Depress and hold Black Button on the ELS Board. While depressing button, turn power input to unit “ON” and continue depressing button until the ELS Board LED flashes three (3) times. The installer then has three (3) seconds to release the button after the LED flashes. • Slowly rotate ELS Board Pulley Clockwise (away from hard stop) until the LED on the ELS board lights. Note : Pinion pulley should be rotating with the ELS Board Pulley during this step. • Hold the Pinion Pulley stationary while tightening the pinion timing pulley screwwith a 5/32 hex wrench.** • The ELS board is nowcalibrated for a RH-PUSH Unit. **NOTE: If LED should turn off during the above procedure without any significant movement of ELS Board Pulley, this is not a problem. The timing zone range is large enough to allow for slight movement of ELS Board pulley during tightening of pinion timing screw. Note: The ELS board is factory-calibrated without any pre-load on the pinion. When the unit is properly installed, and there is pre-load on the pinion, the light on the ELS board will not be lit. This is not a problem. The LED is simply intended to set the ELS Board Pulley in the appropriate “timing zone”.